Categories: Agency News

Contractors All Risk Policy

This policy is specially designed to provide financial protection to Civil Engineering Contractors in the event of an accident to civil engineering works under construction.

Coverage

CAR insurance is an all risk insurance policy that covers loss or damage to civil work during course of construction by any cause not excluded under the policy. 

The Policy covers damage due to:

  • Fire & allied perils
  • Natural calamities like storm, flood, earthquake, rock sliding, and land sliding
  • Riot & strike
  • Theft & burglary
  • Accidental damage, etc.

The policy can be taken by the principal, contractor or subcontractor, jointly or separately.

The policy comprises of 2 Sections

   Section IMaterial Damage – Covers physical loss, damage or destruction of the insured property by any cause other than those specifically excluded in the policy.

   Section IIThird Party Liability – Covers the legal liability falling on the insured contractor as a result of bodily injury or property damage belonging to a third party.

Sum Insured

Section I – Material Damage

a. Total contract price including the estimated cost of labor charges and cost of materials.

b. Materials or items supplied by the principal.

c. Any additional items not included in (a) and (b) above.

Section II – Third Party Liability

The sum insured under section II should represent the per accident limit (the maximum legal liability that may fall on the insured as a result of an accident in the insured’s site). The limit per policy period should be fixed, taking into account the maximum number of such accidents that can reasonably be expected to occur

Important Exclusions under Section I

  • Excess – The first amount of each and every loss to be borne by the insured.
  • Loss or damage due to faulty design.
  • Wilful act or wilful negligence of insured.
  • Loss of or damage to files, drawings, accounts, bills, currency,  stamps,  deeds, evidence of debt,  notes,  securities, checks, packing materials.

Period of Insurance

Period of insurance should be equivalent to the period of contract, commencing from the date of unloading of the first batch of material at the construction site and expiring on the date of handing over of the contract work to the principal, or put to use, or expiry of the policy, whichever is earlier. In case of delay in completion of work, the policy can be extended by paying an additional premium.

For any insurance solutions, please contact Beacon Insurance Pvt Ltd at https://www.beacon.co.in/

Insurance is a subject matter of solicitation

admin

Recent Posts

Digital Nomad Lifestyle and Work-Life Balance

Digital nomad lifestyle The digital nomad lifestyle looks attractive from the outside: laptop open in…

1 week ago

Build Audience Trust With Digital Publishing Ethics

Digital publishing ethics Digital publishing ethics are no longer optional for bloggers, influencers, newsletter writers,…

1 week ago

Remote Workflow Automation for Smarter Workflows

Remote workflow automation Remote workflow automation has become essential for teams that publish content, manage…

1 week ago

Micro Influencer Trends for Creator Jobs

Micro influencer trends Micro-influencer trends are changing how brands hire, brief, and measure creators in…

1 week ago

Monetize Blog Traffic for Passive Income

Monetize blog traffic To monetize blog traffic properly, digital creators need more than page views.…

1 week ago

Slipcovered Headboard Trend for a Chic Bedroom

Slipcovered headboard trend The slipcovered headboard trend is one of the simplest ways to make…

2 weeks ago